Another successful water sampling station upgrade completed alongside one of our regular customers.

The existing control system used 230V E&H analysers, so IES designed and built a new 24VDC control panel to support the upgraded Swan instruments.

Our team methodically removed the old system, identifying all existing cabling and producing detailed disconnection drawings. The new panel was then installed in its place, along with all-new outgoing cabling.

Working closely with the customer, we thoroughly tested and commissioned the complete system—delivering a safe, reliable and modernised solution.

#ControlPanels #WaterTreatment #Instrumentation #ElectricalEngineering #SystemUpgrade #Automation #Commissioning #IES